Some people like surprises (sorpresas)
more than others. The rule of thumb with a renovation: surprise=change
order=$$$
Two issues arose yesterday. The
patio has concrete under the bricks. Because of how uneven the surface was, we
figured it was dirt under the bricks. So, the concrete needs to be removed to make sure
the floor joists can be made level. Today’s
jackhammer noise is the sound of progress. The patio and the arch have been
turned into a heap of bricks and concrete.
And there's a metal tank under the
driveway... It appears to be an old heating
oil tank. Our current HVAC runs on gas and we figure that this furnace is over
30 years old. So, I guess the tank has been there for a while. It’s at the edge
of the house where the foundation will be poured, so it needs to be removed.