The potty was placed on the driveway
with care,
in hopes that the workers would soon be there…
The porta-potty was positioned and
supplies delivered on Dec 23rd. We also had four windows replaced at the front
of the house, where we plan to stay during construction. We have spent our days
moving stuff to the garage, basement, and living room, so demolition can start.
The dumpster got delivered on the 29th
after a previous attempt. Because our street is narrow and has many cars
parked, it’s sometimes hard to even back our Honda Civic into the driveway. Steve,
our General Contractor, ground-guided Samuel as he maneuvered the 30 yard
dumpster into the narrow chute of a driveway.
When we came to Arlington, we didn't expect any future moves, but this is a lot like a PCS (permanent change of station)--can't find anything and a feeling of being unsettled. The random access is the worst part—not remembering what box stuff went into.